source
stringlengths
11
22
reqs
stringlengths
7
10.8k
spacebert_ecss
During all on ground activities, the contamination predictions shall be consolidated with the results of molecular and particulate monitoring.
spacebert_ecss
A connector shall be provided on the exterior surface of the space vehicle for use with manually inserted plugs to enable: 1. isolation, 2. coupling of any explosive subsystem, 3. testing of any explosive subsystem.
2008_earthcare_web
Absolute calibration of the solar background and detection offsets in all receiving channels shall be performed above an altitude of 100km and below the ground surface, for a horizontal integration length not larger than specified in Table 5.2-3.
2008_earthcare_web
On-board software shall be designed with a specific margin philosophy in place.
spacebert_ecss
Battery and solar array power shall be distributed by multiple contacts on both positive and return lines.
2005_skal1_WEB
The total steady state power budget for the African site shall be within the limits specified in SKA Power Budget SKA-SE-POW-TN- 001 [21]
2012_marcopolo_WEB
The DHS system shall support uplink and downlink file transfer.
2021_gmt_oad_web
GMTIFS shall be located at a Folded Port (FP) focal station.
spacebert_ecss
The designer shall specify the mounting technique for assembling the MMICs.
spacebert_ecss
The PAC shall have a lockout status flag set as follows: 1. ‘1’ when the PAC is in a lockout state; 2. ‘0’ when the PAC is not in a lockout state.
spacebert_ecss
The SMS shall include the specified maximum positions of the mechanism.
2011_dot_WEB
Upon request, the User Permissions Subsystem shall provide Core System Personnel registration information to other Core System subsystems with [TBD] seconds.
spacebert_ecss
The SUM shall describe any procedures to be performed by the user in order to be identified or authorised to access or install software on the equipment, to perform the installation, to configure the software, to delete or overwrite former files or data, and to enter parameters for software operation.
2005_skal1_WEB
The SKA1_Mid dishes, when the band 4 capability is selected, shall operate over a frequency range from 2.80 to 5.18 GHz for each polarisation
2001_hats_PURE
The HATS-GUI shall interact with the HOST OS to find files in directories. (This capability is necessary for the HATS-GUI to display file lists.)
spacebert_ecss
If the demonstration specified in 4.2.4.3c is not performed, it shall be demonstrated that all concerned parts of the pressurized hardware are not affected by the exceeded storage environment.
spacebert_ecss
The track width may be less than half of the diameter of the pad in case the following conditions are met: 1. a teardrop reinforcement is added to the connection of the track to the pad, and 2. the reinforced zone has a length ? 0,8x the diameter of the pad. NOTE In Figure 8-3 Zr is the length of the reinforced zone.
2021_gmt_oad_web
The enclosure shall provide a means for protecting the observing chamber from heat released by the enclosure rotation system.
2021_gmt_oad_web
The GMT shall center NGAO guide star during target acquisition in NGAO mode in a maximum of 10 sec.
spacebert_ecss
The cover layer shall be placed in the flexible section of the PCB.
1995_gemini_PURE
The requirements to have instruments operated as single units imply that several user stations will be active at the same time on the Gemini 8m Telescopes. On these user stations, different kinds of users may be working at the same time with the Gemini 8m Telescopes software. Independently of the location of users at the telescope site, they shall be able to access (according to their privileges) any part of the whole setup with a simple logon and coniguration operation. In other words. any subsection of the whole Gemini 8m Telescopes system should be accessible and controllable from any single point (but of course with protection ensuring security and safety). A particularly simple case of multi-use of the system is multi-point monitoring. By this it is meant that, while some (active) user is in control of the Gemini 8m Telescopes, someone else can follow what they are doing by monitoring all the relevant data from telescope and instruments. This will typically be needed by the operation supervisor. All other users wishing to monitor Gemini 8m Telescopes operations have to go through the procedures set up by Operations and get permission to do so. The multi-point monitoring mode might also be important when certain dificult or rare problems occur, when expert advice is needed and can only be obtained from colleagues situated remotely. Multi-point monitoring allows them to follow directly the results of tests performed and investigate how the system is working (e.g. by selecting different display pages with the up-to-date status information on different parts of the system). Multi-point monitoring also allows a local observer to be monitored and advised by a remote supervisor. Monitoring shall exist both in the form of automatic displays of status information at different locations, and in the form of explicit access to the required status information from any point. Monitoring shall not affect the performance of ongoing observations.
spacebert_ecss
The request for verification of the automatic wave soldering process shall include or refer to the detailed report concerning optimization of wave-soldering process parameters.
spacebert_ecss
Deviations from requirement 11.1.1a shall be approved by the customer prior to the start of the verification testing.
spacebert_ecss
Verification by ROD shall be documented in a Review-of-Design report in conformance with the DRD in ECSS-E-ST-10-02 Annex D.
spacebert_ecss
The SPAP shall describe the methods and tools used for all the activities of the development cycle, and their level of maturity.
2017_s45_mrtd_web
Intra-band spatial co-registration of each of the TIR bands shall be better than 0.05 of the spatial resolution.
spacebert_ecss
Synchronous PDOs transfer shall be synchronized by receipt of SYNC object as defined in 6.3.
spacebert_ecss
Dimensionless quantities shall be explicitly denoted as such.
spacebert_ecss
The logbook shall contain the records of total operating hours for each limited-life element identified in the test procedures.
spacebert_ecss
High level (system or element) functional testing shall be performed in preference to individual low level tests.
spacebert_ecss
Three consecutive alert level events shall be treated as action level event.
spacebert_ecss
The SDD shall include any additional terms, definition or abbreviated terms used.
spacebert_ecss
In the case of coexisting autocoded and manually written parts, the software development plan shall include the definition of a clear interface definition and resource allocation (memory, CPU) at PDR.
spacebert_ecss
Each instruction to add a report type to the application process forward-control configuration shall contain: 1. the application process identifier addressed by that instruction, 2. the message type identifier consisting of: (a) the service type identifier; (b) the message subtype identifier.
spacebert_ecss
Inserts shall be analysed according to standards or procedures agreed with the customer. NOTE 1 Inserts are generally used in sandwich constructions with cores of low strength. NOTE 2 For inserts, see ECSS-E-HB-32-22.
spacebert_ecss
Electrical connectors shall provide continuous shielding in all directions.
2008_earthcare_web
ATLID design shall avoid (minimise) the contamination sources and contaminating paths to critical elements and the related consequences on the instrument performance so that the compliance to the instrument performance is not compromised by contamination of optical surfaces. This shall account for laser-induced contamination and laser induced damage effects.
spacebert_ecss
Each request to summary-report the content of a repository shall contain exactly one instruction to summary-report the content of a repository.
spacebert_ecss
Connections shall be protected from harness induced loads.
2021_tmt_srd_WEB
The MIRES wavelength range shall be at least 8 µm - 18 µm, with a goal of 4.5 µm - 28 µm.
2015_due_web
The used version of the processor shall be transparent
spacebert_ecss
It shall be possible to power off the gyro at any time and in any mode of operation without causing any damage to it.
2006_eirenesys15_PURE
Changing the battery shall not result in the loss of data stored in the radio. (M)
2005_clarushigh_PURE
The Clarus system shall disseminate data using standard Internet protocols.
spacebert_ecss
During the entire enabled periodic reporting duration, the parameter statistics reporting subservice shall generate exactly one parameter statistics report at the end of each reporting interval period.
spacebert_ecss
The pass-fail criteria shall be those stated in the SCD-PVA.
spacebert_ecss
When in the LossOfSignal state and RxOnly is asserted the Lane Initialisation state machine should disable the transmitter driver.
spacebert_ecss
The minimum internal pressure to guaranty structural stabilization shall be identified and included in the acceptance data package.
spacebert_ecss
Records shall be kept of the routing test.
2004_hp_srs_web
Materials shall not be flaking or dusting so that a high degree of cleanliness of the flight hardware can be achieved and maintained. This is also applicable to materials used on GSE.
2018_jpss_l0_web
The algorithm shall produce a polar winds product that has a mapping uncertainty (3 sigma) of 5 km.
2005_skal1_WEB
Peeling of bright sources (strength limited by signal to noise ratio) from the visibility data shall be possible.
spacebert_ecss
In case the average result at the operating point is lower than the result obtained in 5.3.4.2a.2 the qualification process specified in the requirements from clause 5.3.2 shall be repeated.
spacebert_ecss
Devices to be mounted shall be designed for, and be capable of withstanding the soldering temperatures of the particular process being used for fabrication of the assembly.
spacebert_ecss
Stamping resulting in stress-raisers shall not be performed.
spacebert_ecss
When contamination predictions exceed the allocated contamination budget, a bakeout shall be performed. NOTE 1 The aim of the bakeout is: · To improve the outgassing behaviour of a material/item. · To reduce the level of surface contamination collected during processing or testing. NOTE 2 Typical materials on which bakeout can be applied are: · Harness · MLI · Carbon and glass fibre components · Glued, coated or potted materials.
spacebert_ecss
The sample for testing shall have one flat surface which does not overlap the dimensions of the sample holder to be used in the test.
spacebert_ecss
Component assembly procedures shall include at least: 1. specifications of parts and materials, 2. inspection and test, and 3. assembly instructions including: (a) preparation, (b) equipment, (c) parts and materials, (d) method, and (e) cleaning.
spacebert_ecss
When tested, the pH shall range from 5,0 to 8,0 and reported in conformance with Annex C.
2008_keepass_PURE
This feature allows user to choose one of the language translations that are available in KeePass
spacebert_ecss
When a complete broadcast frame is received without a CRC error and in the correct sequence, as indicated by its sequence number, the broadcast message contained in that broadcast frame shall be written to the broadcast message interface.
2005_phin_PURE
Bar-coding should be supported for the capture of detailed specimen/sample data to improve the quality and efficiency of data collection.
spacebert_ecss
The PA manager shall approve the product acceptance during the Acceptance or Delivery Review.
2011_dot_WEB
The Core System shall receive time from an external source.
spacebert_ecss
The report shall include the signature or quality stamp of the inspector.
spacebert_ecss
The Local SCET Set object shall allow setting the local time of the node via the CAN Network.
spacebert_ecss
For qualification ‘leakage test’, requirements shall be in conformance with ECSS-E-ST-10-03.
spacebert_ecss
The category “Mass” shall include potting compounds, moulding compounds, cast of formed objects, solid wires and thick plastics. NOTE This category is defined for materials having a defined bulk but not falling into the volume classification.
2008_earthcare_web
The maximum expected contamination levels shall be compatible with the instrument contamination budget.
spacebert_ecss
Spare coupons may be stored in an uncontrolled environment.
2006_eirenesys15_PURE
Railway Emergency call confirmation messages shall be of eMLPP priority 4 - “Railway information and all other calls” (see section 10.2). (M)
2007_eirenefun7_PURE
When the mobile changes network automatically, a visual and audible indication shall be given. (M)
spacebert_ecss
Vibration testing shall be performed in the three orthogonal axes: one out-of-plane and two in-plane.
2006_hgs_ird_web
The HSC shall make available to the ICC@ICC the time correlation data received from the MOC.
2005_claruslow_PURE
The watchdog service shall be able to restart unresponsive Clarus system services.
spacebert_ecss
The outgassing criteria for materials in the vicinity of sensitive items around RT shall conform to Table 5-1.
spacebert_ecss
The supplier shall provide a report on the result of the propulsion transient analysis in conformance with Annex G. NOTE Transients cover the parameter variation that occurs during a voluntary change (including start-up and shut down) of operating conditions.
2006_eirenesys15_PURE
SIM cards shall contain a list of authorised networks so that networks shall be displayed (or automatically selected if automatic network selection has been enabled) in the following order of priority (see [MORANE SIM] for more details): (M) home EIRENE network; ‘foreign’ EIRENE networks; non-EIRENE networks (with order of priority predetermined by virtue of international subscriptions and roaming agreements).
spacebert_ecss
The AR-DY shall include the discussion on the understanding and clarification of the requirements.
2016_teser_web
The EPS subsystem shall be scalable to accommodate different RS.
spacebert_ecss
The test procedures shall be as follows: 1. Turn on the measurement equipment and wait until it is stabilized. 2. If the EMEVP specifies to check the measurement system, check it by evaluating the overall measurement system from the current probe to the data output device, as follows: (a) Apply a calibrated signal level, at 1 kHz and 100 kHz, which is at least 6 dB below the emission limit to the current probe. NOTE A power amplifier can be necessary at 1 kHz. (b) Apply through the current probe a DC-current equivalent to the EUT supply current. NOTE 1 A DC current is applied for verifying that the current probe will not be saturated by the EUT DC supply current. NOTE 2 This DC current is applied through the LISN for applying the same impedance through the probe as with the EUT. (c) Verify the AC current level as measured with the probe by comparison with voltage across the 1 W resistor at 1 kHz and the 10 W resistor at 100 kHz; also, verify that the current waveform is sinusoidal. (d) Scan the measurement receiver for each frequency in the same manner as a normal data scan. Verify that the data-recording device indicates a level within ±3 dB of the injected level. (e) If readings are obtained which deviate by more than ±3 dB, locate the source of the error and correct the deficiency prior to proceeding with the testing. 3. Test the EUT by determining the conducted emissions from the EUT input power leads, hot line and return, and measure the conducted emission separately on each power lead, as follows: (a) Turn on the EUT and wait for its stabilization. (b) Select a lead for testing and clamp the current probe into position. (c) Scan the measurement receiver over the frequency range, using the bandwidths and minimum measurement times specified in Table 5-2, clause 5.2.9.1. (d) Repeat 5.4.2.4a.3(b) and 5.4.2.4a.3(c) for each power lead.
spacebert_ecss
A full visual inspection shall be performed against the inspection requirements stated in clauses 5.5.3.2.4 to 5.5.3.2.21, as follows: 1. Visually examine each component for workmanship, identification and finish. 2. Examine the deliverable items for conformance to general assembly drawings, with respect to critical dimensional parameters. NOTE The inspection methods to be used include: • electroluminescence • infrared inspection; • inspection with the naked eye; • inspection using microscopes; • any equivalent methods.
spacebert_ecss
The supplier shall provide details of the outcome of the qualification programme to the customer.
spacebert_ecss
The test equipment shall be as follows: 1. DC high voltage supply or an ESD generator as specified in IEC 61000-4-2 (Edition 1.2). NOTE Use of the ESD generator is less hazardous than use of the DC high voltage supply for test operators. 2. The discharge primary circuit is constituted of: (a) 6 kV spark gap, NOTE 1 An air spark gap or an overvoltage suppressor in a sealed pressurized envelop can be used. NOTE 2 An air spark gap is less stable and has longer rise time. (b) 50 pF capacitance, high-voltage capacitor with inductance less than 20 nH, (c) 47 W damping resistor (high voltage specification), NOTE The value can be adjusted at critical damping depending on value of capacitance C and self-inductance of the discharge circuit; (d) 10 kW resistors (high voltage specification). NOTE Choke resistors prevent high-frequency components of discharge from flowing in uncontrolled paths so the discharge parameters are not dependent on length and position of high-voltage source wires. 3. Monitoring devices: (a) Two current probes, 100 A peak capability and more than 100 MHz bandwidth, (b) One high-voltage probe, 10 kV range, 1 MHz bandwidth, NOTE If the probe input impedance is not high enough, it can prevent gap arcing by lowering the available voltage. (c) One two-channels digital oscilloscope with pretriggering capability. NOTE Typical values are 100 ns pretrigger time, display window in the range 1 µs to 10 µs and resolution better than 4 ns.
2021_gmt_oad_web
Each instrument shall provide “quick look” data reduction software to allow near real-time quality assessment of the instrument’s scientific data.
2007_jwst_mrd_web
When observing a position on the celestial sphere that exhibits 1.2 times the minimum Zodiacal light background radiance, the stray light incident into an instrument acceptance cone at the instrument pickoff mirror shall be less than an equivalent background in the field of view having a spectral radiance at the wavelengths and exclusion angles given in the table below. Sources excluded from contributing to this stray light are [1] sources inside the exclusion angle of the nominal line-of-sight, [2] sources brighter than AB mag=1 within 2.5 degrees of the line-of-sight, [3] solar system planets other than the Earth-Moon system.
2021_tmt_ord_WEB
The TMT Observatory maintenance process shall include warehouse inventory and property control.
spacebert_ecss
Error source contributors 5.5.6.2a.1, 5.5.6.2a.2, 5.5.6.2a.3, 5.5.6.2a.4 shall be validated against on ground test data at BOL for finite scenarios.
spacebert_ecss
The Micro-VCM datasheet shall contain the IR data results.
spacebert_ecss
30 sample wrap connections shall be prepared with a calibrated tool.
spacebert_ecss
Water shall be supplied to points of use in conformance with the interface specifications for water temperature, pressure, flow rate and quality.
spacebert_ecss
A link shall comprise one or more lanes.
spacebert_ecss
For each instruction to generate a one shot report for a diagnostic parameter report structure that it rejects, the diagnostic reporting subservice shall generate the failed start of execution notification for that instruction.
spacebert_ecss
In conformance with clause 9.6.11, the SCD-EPD shall include: 1. the interconnection technique parameter; 2. the material and dimension of the interconnectors; 3. the value of the pull speed in mm/min and direction (0°, 45° or 90°); 4. the value of the ultimate pull strength in N.
2021_tmt_ord_WEB
The TMT Observatory shall enable real-time selection and execution of observations with flexibility in response to changing conditions and ongoing observations.
spacebert_ecss
Potable water needs, including water for drinking, oral hygiene, and food preparation (e.g. rehydration), shall be specified.
0000_mss_WEB
Electrical connections shall be provided by means of unified connective elements and a way that prevents all risks of damages caused during normal operation compliant with the manuals; inter-module electrical connections markings shall be identical with those used on the cabling schemes.